Postby David Jones » July 2nd, 2013, 4:00 pm
Its been a while since my last update, but getting the installation in takes longer than you think. Everything now is pretty much up and running, apart from the flaps, the servos need programming, and by someone who knows how...I think its going to be a job for Mike Altham, he's pretty good with electric wizardry. We took the model down to our local club field where we were able to get the engines to run in synch with one another, (we'd run them in separately on another model). I'm really pleased with the final result for this, the two 38's sound absolutely brilliant at both tick over, cruise and top end revs. My mate Alan has done a cracking job in making up the exhausts and cutting to the cowls for a lovely fit. The engines are finished off with a pair of beautiful stainless steel spinners made for me by my other mate Alan (Cantwell).
The first photo shows the model without the nose cone so you can see the "service" panel I've made up which houses the two switches, air valve and charging sockets. These will be concealed behind the door immediately aft of the cockpit windows. We have sorted out a high torque starter for the engines, but Alan prefers to start them by hand when he can, being new to petrol engines, I was surprised at just how easily he was able to start them.
You do not have the required permissions to view the files attached to this post.