MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step Build

Why not share your information on your latest creation
Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 3:39 pm

A-photo 29 (800x600).jpg
A-photo 29 (800x600).jpg (103.84 KiB) Viewed 11664 times


Here you can see that the saddles for the air tanks have been put as far forward as possible in the fuselage.

A-photo 30 (600x800).jpg
A-photo 30 (600x800).jpg (116.89 KiB) Viewed 11664 times


A-photo 31 (800x600).jpg
A-photo 31 (800x600).jpg (93.54 KiB) Viewed 11664 times


A-photo 32 (800x600).jpg
A-photo 32 (800x600).jpg (113.11 KiB) Viewed 11664 times


A-photo 33 (800x600).jpg
A-photo 33 (800x600).jpg (105.53 KiB) Viewed 11664 times


A-photo 34 (800x600).jpg
A-photo 34 (800x600).jpg (114.42 KiB) Viewed 11664 times


I don't know if it is immediately obvious that the self tapping threads hold the removable Battery/Rudder Servo tray it is shaped like a garden shovel and recessed on the sides to inter lock in to the fuselage former.

A-photo 35 (800x600).jpg
A-photo 35 (800x600).jpg (108.92 KiB) Viewed 11664 times
Last edited by Dean Mosley on February 24th, 2015, 5:28 pm, edited 1 time in total.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 3:42 pm

A-photo 36 (600x800).jpg
A-photo 36 (600x800).jpg (141.3 KiB) Viewed 11664 times


A-photo 37 (800x600).jpg
A-photo 37 (800x600).jpg (111.54 KiB) Viewed 11664 times


A-photo 39 (800x600).jpg
A-photo 39 (800x600).jpg (105.87 KiB) Viewed 11664 times


You can see below how I have had to file down the spar running from left to right of the fuselage/Picture this was to allow the Sierra Tail wheel to recess fully, the underside was then reinforced with 1.5mm Ply

A-photo 40 (800x600).jpg
A-photo 40 (800x600).jpg (96.82 KiB) Viewed 11664 times
Last edited by Dean Mosley on February 24th, 2015, 5:31 pm, edited 1 time in total.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 4:50 pm

Bellow you can see the fuselage up side down looking at where the Battery/Rudder servo Tray sits.
you will see the addition of a spruce spar which the tray locates in to and with the addition of the Carbon tissue later will give/offer a greater bond to the bulk head....

I hope :?

A-photo 41 (800x600).jpg
A-photo 41 (800x600).jpg (109.42 KiB) Viewed 11662 times


A-photo 42 (800x600).jpg
A-photo 42 (800x600).jpg (128.37 KiB) Viewed 11662 times


A-photo 43 (800x600).jpg
A-photo 43 (800x600).jpg (107.72 KiB) Viewed 11662 times


Above some of you will have noticed that I have installed four extra formers that tie in to the Bulk Head and run back to the cockpit.

These were made of bass, "Iv got 112cc of Engine/7.5Lb + Weight Hanging/Pulling on what should be a dozen or so Balsa Stringers" (No chance...)

So what I have done is to splice the big Balsa stringers and insert Bass and run it down through and past the rear of the cockpit 2/3 of the way back on the Wing

A-photo 44 (800x600).jpg
A-photo 44 (800x600).jpg (88.23 KiB) Viewed 11662 times


Bellowis the start of the tail plane

A-photo 45 (800x600).jpg
A-photo 45 (800x600).jpg (116.46 KiB) Viewed 11662 times
Attachments
A-photo 42 (800x600).jpg
A-photo 42 (800x600).jpg (128.37 KiB) Viewed 11662 times
Last edited by Dean Mosley on February 24th, 2015, 5:48 pm, edited 1 time in total.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 4:53 pm

You will notice the introduction of additional strengthening fillets neither of these were on the Plan. I have also added the hinge blocks

A-photo 46 (800x600).jpg
A-photo 46 (800x600).jpg (119.94 KiB) Viewed 11661 times


As you will know by now I am trying desperately to create a really nice SCALE Model and the Meister tail isn't quite there... So I have began to re scale the hinging of this model by using piano wire and blocks

A-photo 47 (800x600).jpg
A-photo 47 (800x600).jpg (119.21 KiB) Viewed 11661 times


A-photo 48 (800x600).jpg
A-photo 48 (800x600).jpg (121.99 KiB) Viewed 11661 times


Here we have began to remove and create the hinging.. :o

A-photo 49 (800x600).jpg
A-photo 49 (800x600).jpg (115.63 KiB) Viewed 11661 times


A-photo 50 (800x600).jpg
A-photo 50 (800x600).jpg (117.52 KiB) Viewed 11661 times
Last edited by Dean Mosley on February 28th, 2015, 2:35 pm, edited 2 times in total.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 4:56 pm

I also introduced the bracing spar which is webbed on the front edge, the plate in the centre retains 2 x 5mm Carbon tubes which all comes together and will give rigidity, there is a saddle plate in the fuselage that the Carbon fits in to

"True this bit could have been neater, Sorry :x "

A-photo 51 (800x600).jpg
A-photo 51 (800x600).jpg (112.08 KiB) Viewed 11661 times


Hinging now starting to take shape..

A-photo 52 (800x600).jpg
A-photo 52 (800x600).jpg (117.23 KiB) Viewed 11661 times


Here you will notice the exit point for the Closed Loop for the Rudder and what was to be the Push Rods for the Elevator which has now been Stopped

A-photo 53 (800x600).jpg
A-photo 53 (800x600).jpg (116.39 KiB) Viewed 11661 times


A-photo 54 (800x600).jpg
A-photo 54 (800x600).jpg (103.47 KiB) Viewed 11661 times


ABOVE
Again the Bass brace in evidence on the Rudder also, "I have to say that I am suppressed at this model not having this in situe from the Plan...? Even if it is all covered in 3mm Balsa"

BELLOW
You will see that the Balsa ruder location key has also been replaced with 6mm Bass

A-photo 55 (800x600).jpg
A-photo 55 (800x600).jpg (94.98 KiB) Viewed 11661 times
Last edited by Dean Mosley on February 28th, 2015, 2:41 pm, edited 2 times in total.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 4:59 pm

Balsa block is laminated with 0.8mm Ply for streanth

A-photo 56 (800x600).jpg
A-photo 56 (800x600).jpg (114.13 KiB) Viewed 11661 times


A-photo 57 (800x600).jpg
A-photo 57 (800x600).jpg (113.67 KiB) Viewed 11661 times


A-photo 58 (800x600).jpg
A-photo 58 (800x600).jpg (142.12 KiB) Viewed 11661 times


Here you will see the webs now in place and notice the introduction of the Ply/Balsa Servo bays starting to take shape

A-photo 59 (800x600).jpg
A-photo 59 (800x600).jpg (100.65 KiB) Viewed 11661 times


The Ply plate on the bottom is to Securely/Snugly Hold/Support the servo while in situ to prevent any play

A-photo 60 (800x600).jpg
A-photo 60 (800x600).jpg (114.34 KiB) Viewed 11661 times
Last edited by Dean Mosley on February 28th, 2015, 2:44 pm, edited 2 times in total.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 22nd, 2015, 5:02 pm

Here you have the finished product minus the fitted Servo. The covers are held down M3 bolts on all corners tied in by self threading inserts

A-photo 62 (800x600).jpg
A-photo 62 (800x600).jpg (113.55 KiB) Viewed 11661 times


Bellow is the channelling that was put in place for the Servo wires which will then exit in to the fusalage

A-photo 63 (800x600).jpg
A-photo 63 (800x600).jpg (120.38 KiB) Viewed 11661 times


Here you have a very bad picture of the start of my Rotary Drive System (RDS) which will be used in the Ailerons in order to try and conceal as much as possible.

These were produced for me by a good Friend who has kindly offered to assist me with all my metal working needs (Bryan your the best..) ;)

(I'm sure you will find time to finish crafting that 50cc Radial of yours!)

"I still think your tight in that you wouldn't build a 150cc Radial for me :evil: "


P1010017 (800x600).jpg
P1010017 (800x600).jpg (90.65 KiB) Viewed 11332 times
Last edited by Dean Mosley on February 27th, 2015, 12:02 pm, edited 2 times in total.

Dave Jones
Posts: 116
Joined: December 4th, 2008, 8:31 pm
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dave Jones » February 23rd, 2015, 11:00 pm

Wow! You sure are getting on with this! Il have to get my finger out! LOL I see you have put servo hatches in the tail Plane? Are you not worried about adding weight at the back?

Dave.

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 24th, 2015, 5:05 pm

Hi Dave,

I am and it wasn't my intention to go this way (I was Instructed to do it this way....!) by my Inspectors, if you look at a coupe of the fuselage pictures closely you will see the Orange 3mm piano wires that I had previously fitted but were asked to remove "That was fair enough"

But I have since noticed I think...? Steve Rickets as adopted a push rod system on his P-47!
I could be wrong but from pictures Iv seen in the Magazines it looks to be that way.

I have put the air tanks way up front and also the Servos, I will have operational Cowl Flaps as additional nose weight and possibly a large silencer, so I am trying to get it all up front, Oh sorry plus 4 x Lipo packs on the bulk head, 2 x Receiver Packs 1 x Ignition, 1 x Lighting

"So fingers crossed..." :?

But I am very mindful of the weight yes.

Steve Rickett 2333
Posts: 235
Joined: May 13th, 2009, 8:18 am
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Steve Rickett 2333 » February 24th, 2015, 9:55 pm

Good spot! I do have pushrods on my P-47....but it is only the Topflite 50cc version. I would go the route you are doing now if I were to build a bigger one!

Nice progress btw!

Steve

Gregg Veasey
Posts: 339
Joined: December 4th, 2008, 9:46 pm
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Gregg Veasey » February 24th, 2015, 11:08 pm

I understand why the use of 3mm wire push rods was asked to be changed but a model of this size could still use servo's at the front if the elevators had a suitable joiner and a heavy duty carbon rod was used that was supported through the fuselage. I know of many warbirds that are done this way and use either a single high power servo or 2 servos coupled to power it.
I'm not against servos at the back other than the compensating weight needed at the front but it sounds like you have enough at the front to sort that issue. I'll be interested to see what the final weight comes out at. There are many in the states at 50-60lb!

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 25th, 2015, 5:26 pm

Hi Greg,

Its interesting to find out other peoples points of view, and here how others tackle things like this. I had also purchased 5mm Carbon Push Rod with Alloy connectors, it was quite heavy but some how just looked wrong, the Original aspiration was to use 2 x 14Kg Servos and the wire ran through all of the fuselage formers, that part was rock solid. It was connected in the centre with a brass threaded joiner due to the length of the fusalage, as the piano wire was also threaded and would have used additional grub screws to ensure absolute security, the concern arose around the length of exposed wire at the tail end and the "Possibility" of some flex...

Off the top of my head the length of wire exposed was around 4-4.5" I'm not grumbling, please don't get me wrong but the added Ply and Balsa with the addition of 2 x Metal geared Servos and Nuts and Bolts (Ratio of 3 x 1 weight on the Nose) will really add up on the nose but at this point I have no other option

(Bolting in to the side of the fuselage wasn't an option for me..... :evil: )

Dean

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 25th, 2015, 5:28 pm

Sorry Greg,

I did mean to ask how did the over weight Jug fly, just out of interest.....?

Gregg Veasey
Posts: 339
Joined: December 4th, 2008, 9:46 pm
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Gregg Veasey » February 25th, 2015, 5:36 pm

Hi Dean

Have a look at http://veaseyjet.com/VeaseyJet/Model_bu ... uilds.html to see what I mean. I think the Meister Zero build shows it best but they all use the same technique.

I haven't flown any warbirds (fighters) over 40lb but most seem to be over that in the states so must perform OK.

Gregg

sean smith
Posts: 208
Joined: December 19th, 2008, 2:25 pm
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby sean smith » February 25th, 2015, 6:15 pm

My Meister P47 weighs in at 43lb and flies fine on a Zenoah 80.

Phil Clark
Posts: 941
Joined: December 4th, 2008, 7:07 pm
Location: Chester-le-Street, Co Durham
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Phil Clark » February 25th, 2015, 10:41 pm

Nothing wrong at all with pushrods on models of this size.......as Gregg rightly says, as long as they are rigid & supported inside the fuselage they are fine. Even piano wire can be fine but not just running through formers, if it's run in plastic tubes that give support (along the entire length......but not so much they become tight), they are fine.

Below are photos of the elevator end of a 1/4 scale Mk.1a Spit + the elevator torque rod assemblies being used in a current 1/5 Bearcat build. 8 swg piano wire with twin 1/16" steel horns sandwiching an M3 ball link. Note also the brass tube bush which will be bonded into a ply support hanger notched into false TE on the tail plane giving additional support to the torque rod assembly.

The Spit used twin 10mm carbon tube pushrods with machined aluminium end fittings epoxied & cross pined in place. These were drilled & tapped M3 to take M3 threaded rod which in turn was sleeved in 3mm I/D carbon tube to stiffen. The Bearcat will be identical but with 6mm rods instead of 10's as the run to the back is a lot shorter. I found 6mm on something as large as the 1/4 Spit that little bit too flexible.
Attachments
Mk1Spit_49.jpg
Mk1Spit_49.jpg (26.81 KiB) Viewed 11433 times
Bearcat_02.jpg
Bearcat_02.jpg (30.67 KiB) Viewed 11433 times

Dave Jones
Posts: 116
Joined: December 4th, 2008, 8:31 pm
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dave Jones » February 26th, 2015, 12:18 am

WOW . . This has brought up a few answers! Lol I like the carbon push rod idea, being shown by one of the TJD guys how to do it, never had a fail on me, but I do cyno one carbon tube Ito another, and it's rock sold, the only plane ive had with tail plane servos was my Surginson p47, it made it tail heavy causing lots of weight up front, and was around 42lb.

User avatar
Rob Buckley
Posts: 565
Joined: March 14th, 2009, 12:08 pm
Location: Just Outside Bath
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Rob Buckley » February 26th, 2015, 7:39 am

Don't forget, the full size used pushrods all the way from the driver's steering wheel.
LMA Secretary - I've got a reasonable idea where you live!

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 26th, 2015, 11:23 am

Rob.....!

That's a scary statement you make...? :shock: and you didn't even leave your name

My garage is locked and alarmed all the time... :lol:

My name is Dean Mosley, and I live over in South Wales, "Crickhowell" I am the BMFA's Mid & West Education Coordinator if that is of any help?

If you do know me I only hope its for the right reasons.... :oops:

"I do try to behave myself.."

Dean Mosley
Posts: 55
Joined: February 20th, 2015, 12:42 am
Location: South Wales
Contact:

Re: MEISTER Republic P-47D-22-RE Thunderbolt, Step by Step B

Postby Dean Mosley » February 26th, 2015, 11:33 am

Good afternoon all,

Well I only wish that I had posed this question before starting the build "or" prior to having my first inspection.

I would like to thank all of you for taking the time to respond so appropriately, sadly its a little too late for me now short of building a new Tail section but they do say every day is a School Day and I've just spent 3 Days in 3 Schools Building the BMFA's Model Darts with the Pupils of all ages and abilities. The School I did yesterday was a Special Needs one and what I learned from them is invaluable and more to come, so I fully believe that what you guys have given me will most certainly assist and better me as a builder in both this this and other projects

THANK YOU ALL ;)


Return to “Your New Projects”