Postby Phil Clark » September 29th, 2013, 9:54 pm
I hope to have the bulk of the building complete by Christmas. there is still a lot of internal work to do.....it sounds like a big model at around 100" square, but it's very slim and there Is a lot of kit to be fitted into a very small space so it's taking a lot of planning time.
I also have 2 full depth fully detailed cockpit to do which will consumer at least 100 hours, plus as we've converted to the 2 seater, I have the vacform tooling to produce for the rear canopy which required the initial glassed foam/balse plug, a female mould, then a poured resin vacform tool. Once thats done, both canopies are to the side hinged as per the full-size. The main leg & inner clam shell doors are to be done then it's all the surface detail. There is a lot to be added to the glass fuz as it's only basically detailed in the original mouldings.
I'm not anticipating completion until well into the springs..........as for flying, this is destined for a customer in Spain, so I guess we'll have to be happy with some video, though I will be setting everything up on my TX and doing all the usual ground based checks (and having a bit of a drive about!!) prior to packing it into it's crate for it's trip down to Spain.
Phil