Postby MalcolmDouglasPorter » January 28th, 2015, 2:37 pm
I removed the "splint" and all is OK except that the tail plane mounting is not quite horizontal, it slopes backward a little. I may have to consider some major surgery to correct this as the tail plane attitude depends on this being correct. I may consider adjustment to the tail plane to correct the fault, but I will do whatever is the best solution. I must also consider the appearance of the thing, not just the integrity!
These photos will be that last of the whole thing for a while as the main construction of the fuselage is now compete with many little jobs still to do, and one big job, the undercarriage! There is one other job that is very important, and that is the connection regime of the two main halves. This needs to be about right, although very simple to achieve. As is the case with scratch building, ideas change as we progress. In this regard I have decided that in addition to the main wing mounting box, to add a small location tube to the main plane. This will use the sleeves embedded across the fuselage and in the wings to take the aluminium tube in the usual way. My original idea was to glue some dowel into the wings and locate this into holes in the wing root, this clearly is not good enough. This will also help to strengthen the undercarriage mounting which is located near to this tube. Lots to do before the construction of the tail plane and wings etc, I must stay in control and not get carried away! I am hoping that the tendency to make cock ups is under control when I start the wings, I must not get excited and rush into this.
Another idea I have been considering is to install some flexible conduit for the wiring. Can anyone point me towards the best type for this please.
I have used this impasse today to do some chisel sharpening, all very important of course
-
Attachments
-
- Just a few inches to go!
- P1280019.JPG (143.13 KiB) Viewed 10794 times
-
- As you've never seen it before.
- P1280021.JPG (160.79 KiB) Viewed 10794 times