Postby Karl mander » April 8th, 2016, 9:24 pm
Dave - thanks for your comments, your cheque is in the post!
Paul- thanks for the update, the tempest was built to test an engine, a weslake twin, thus was a little rough and ready, look forward to seeing you work your magic on it.
In regards to the fury, after having the wings signed off I've been cracking on with the tail feathers.
The plan is to have it detachable, with locating lugs and a ply tongue locking it into place.
Originally the tailplane had a 1"by 1/4" spar running through it, however I had one of my moments and decided that to add confidence I would add another spar.
Thus installed a second spar made up from two 1/2" by 1/4" spars with lite ply webbing, this can be seen as the gash in the top skin of the tailplane. The tailplane is undoubtedly as strong as one of my wings.
I did have grand plans to install a electric locking system for the fury wings, but after spending hours fathing around have gone down the K.I.S.S. route, thus doing everything manually.
The 6mm hinge pins are secured in place by other locking bolts, the wings are raised manually.
There is some great footage on you tube of a 1/4 scale sea fury with an electric locking system, I will try and find and post the details.
-
Attachments
-
- _20160408_213626.JPG (422.2 KiB) Viewed 13522 times
-
- _20160408_213757.JPG (44.64 KiB) Viewed 13522 times
-
- _20160408_213708.JPG (48.2 KiB) Viewed 13522 times
-
- _20160408_213841.JPG (283.74 KiB) Viewed 13522 times