Postby Phil Clark » February 1st, 2009, 11:40 pm
Plenty happening on the Spitfire over the last few weeks........all remaining servos have been installed and the motor and colling duct install is complete. The steerable tailwheel is also complete, but most of the last 2 weeks have been spent concentrating on more of the internal detailing.....
The LiPo's have also arrived (2 x 6s 13,500Mah + 1 x 2s 13,500Mah Dualsky packs to give a possible 14s in total is required), which has allowed us to 'fire up' the Hacker H-200 motor this last weekend. Mated to a 32" 'Solo' 3 blade variable pitch prop, the performance was staggering with in excess of 200A being pulled. Further testing is required to get the right prop for the motor/ESC/cell combo we have (the 32" Solo set at 10 3/4" pitch is too much), but it's looking promising so far. We've also been doing a little testing on the 'Benedini' onboard sound system....we've only had 1 of the planned 3 speakers working at present, but with all 3 linked up, it looks like we should be able to produce around 105dB at 1m..................
Phil
-
Attachments
-
-
- Mk1Spit_286.jpg (43.64 KiB) Viewed 20426 times